PROJECT CHALLENGES
Delivering a project of this scale required globally distributed teams, thousands of design deliverables and multiple legacy systems to operate as one. Fragmented data, manual workflows and limited real-time visibility created challenges across coordination, planning and execution.

THE SOLUTION
Teknobuilt deployed PACE OS as a non-disruptive digital layer, connecting project data and workflows across engineering, procurement, construction, commissioning and supply-chain operations. More than 15 legacy systems were integrated through APIs, while Advanced Work Packaging, Lean methodologies and the Digital Control Tower gave teams real-time visibility from design through onsite execution.

RESULTS
The connected delivery strategy improved productivity, strengthened schedule reliability and simplified scope management. Globally distributed teams gained clearer information, faster coordination and greater confidence when planning work and materials.